The storms I spoke of yesterday did a good job of filling up all the creeks in the Resort.
I personally recorded 1.79 inches during the 24 hour period starting at 1:00pm yesterday,Most of it fell in a 1 hour period 1.25 inches ,The rest of the day was light rain to the tune of 0.54 inches.
From the front porch...and yea those are my pv panels and battery's in the front drive....soon soon! Power center first...
Sunday, August 22, 2010
Saturday, August 21, 2010
Power room #1
Power room started today, Took advantage of some spare time.
First up put up some OSB on the chosen wall. Then paint the wall...
A good 8 x 8 wall space is required for component mounting and room for air to circulate around the inverter and charge controller.
Those clouds dropped 1.79inches in about 2 hours.
and that's the way it is,
cheers,
bb.
First up put up some OSB on the chosen wall. Then paint the wall...
A good 8 x 8 wall space is required for component mounting and room for air to circulate around the inverter and charge controller.
Left to right, inverter , main battery disconnect , combiner box , and charge controller. Missing 2 A/C panels,battery meter,hard pipe,unistrut for piping,sealtite flex,lighting suppressor and a lot of wiring and labor
Those clouds dropped 1.79inches in about 2 hours.
and that's the way it is,
cheers,
bb.
Friday, August 20, 2010
Happy Birthday!
Took a few days for my B-day and getting Sarai off to U.T for her start off.
The solar panels arrived on my birthday,But as you see they didn't go to far from the truck.I popped open one carton for inspection and series 2 of them in full sun and got 62.3volts, 2 volts more than expected.
They are well constructed but large. This will be fun putting the array on the south roof. I have designed a Unistrut frame that will minimize the roof penetrations for mounting.I will be able to shift the entire array by myself for seasonal tilt to the south,Then back to 5 degrees for the extended west exposure during summer.I had to call my friends at Wholesale Electric for some special Unistrut devices that I could not ever find out here.
I will be fabricating all my cables on site.
The Goldwing is covered by 2 panels.
I really like the Solarline 2 MC locking cables.For many years we hard piped or ran SealTite flexible tubing ,pulled wires ,installed ring terminals in a junction box just to get the current to the power room. Now snap some MC2 cables and there ya go
The solar panels arrived on my birthday,But as you see they didn't go to far from the truck.I popped open one carton for inspection and series 2 of them in full sun and got 62.3volts, 2 volts more than expected.
They are well constructed but large. This will be fun putting the array on the south roof. I have designed a Unistrut frame that will minimize the roof penetrations for mounting.I will be able to shift the entire array by myself for seasonal tilt to the south,Then back to 5 degrees for the extended west exposure during summer.I had to call my friends at Wholesale Electric for some special Unistrut devices that I could not ever find out here.
I will be fabricating all my cables on site.
The Goldwing is covered by 2 panels.
Units still in shipping cartons,along with combiner box and main battery disconnect
Service tag.I really like the Solarline 2 MC locking cables.For many years we hard piped or ran SealTite flexible tubing ,pulled wires ,installed ring terminals in a junction box just to get the current to the power room. Now snap some MC2 cables and there ya go
Time to build this out....
@ 24 volts.With manual seasonal tilt feature.
Tuesday, August 17, 2010
Dreams Realized
Things are getting exciting, Most of the solar package has made it's way to
Ft Davis, My pv panels are in El Paso as of yesterday and may be here today...
Just to give an idea of the size of the equipment, You may be able to tell from these pic's
Charge Controller M.P.P.T. Xantrex 60 amp
Battery's Trojans L16RE-B @370 AH x2=740 AH bank.
Outback VFX-3524. 24 volts in , 3500 watts A/C out with auto transfer
I'll begin the power room this weekend.
and that's the way it is.
cheers.
bb.
Ft Davis, My pv panels are in El Paso as of yesterday and may be here today...
Just to give an idea of the size of the equipment, You may be able to tell from these pic's
Charge Controller M.P.P.T. Xantrex 60 amp
Battery's Trojans L16RE-B @370 AH x2=740 AH bank.
Outback VFX-3524. 24 volts in , 3500 watts A/C out with auto transfer
I'll begin the power room this weekend.
and that's the way it is.
cheers.
bb.
Monday, August 16, 2010
Sunset Last Night 8-15-2010
Friday, August 13, 2010
Done!!!!!
Subscribe to:
Posts (Atom)